PURPOSE:
To lay down the procedure and methods for collecting the waste from all sections of
production departments to maintain hygienic environment of plant and responsibility for
implementation of this procedure.
SCOPE:
This procedure applies for whole production department.
RESPONSIBILITY :
The House Keeper.
The Production Supervisor.
The Production Manager.
PROCEDURE
- Clean any spillages on shop-floor immediately.
- Empty the waste bin of packing department at an interval of every one hour.
- Collect waste from all the sections in janitor room.
- Sort out the waste from packing section in presence of an authorised person.
- Dispose the waste into the scrap yard.
- Destroy all scrap printed packaging material by incineration in presence of quality assurance and security personnel. Record the destruction.
- Lift the scrap from scrap yard every Saturday evening.
Author: (GM Production) | Checked by: (QC Manager) | Authorised by: (Director Technical) |
Date: | Date : | Date : |
(Review date on or before 12 months from date of authorization)