Standard Operating Procedure For Entering And Leaving To First  Change Room Standard Operating

by Pharmadocx Consultants

1st Change Room

  1. Remove the factory attire and them neatly in the almirah provided in the 1st change
  2.  Rinse your hands with the sterile antiseptic solution (i.e savlon)  in use as per  cycle in basin provided for the purpose.
  3. Open the door of the 2nd change room. Enter the 2nd change room.
  4. Switch of the UV tube when in and switch on when you are out.
  1. DE- GOWNING PROCEDURE
  1. Remove the booties, boiler suit and snood and put them in the uniform bag.
  2. Remove the disposable mask and the hand-gloves, and bring them out of the 1st change room along with the uniform bag.
Author: (Production Manager  )Checked by: (QA Manager)Authorized by: (Director Administration)
Date:Date :Date :

                 (Review date on or before 12 months from date of authorization)

Written by Anmol Singh

Anmol Singh Completed his Bachelors in Field of Mechanical and Automation Engineering. He has over 2 Years of experience in field of Pharmaceuticals, Medical Devices, Cosmetics Manufacturing.

16 June 2023

You May Also Like…

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

You cannot copy content of this page

Open chat
Contact Us!
Chat with Us on WhatsApp! We reply within 5 minutes!