1stAIR LOCK
- Remove the factory attire and them neatly in the almirah provided in the 1st change
- Rinse your hands with the sterile antiseptic solution (i.e savlon) in use as per cycle in basin provided for the purpose.
- Open the door of the 2nd change room. Enter the 2nd change room.
Author: ( Production Manager ) | Checked by: (QA Manager) | Authorized by: (Director Administration ) |
Date: | Date : | Date : |
(Review date on or before 12 months from date of authorization)
0 Comments