PURPOSE:
To lay down the procedure for internal labeling during Quarentine, Storage and Processing.
SCOPE:
This procedure applies for Internal Labelling during storage.
RESPONSIBILITY :
1. Production Manager
PROCEDURE:
i) Paste “Material Under Test” printed yellow sticker on all the containers, of those material which are under test.
ii) Paste “CHECKED” Printed green sticker on all the containers, of those material, which are cleared by QA.
iii) Paste “Sampled” printed sticker on those containers, whose content are sampled.
iv) Paste “Rejected” printed red sticker on those containers, which contain rejected material.
v) Paste the following sticker on containers on equipment under operation.
Sticker
MATERIAL UNDER PROCESSING
- Material:
- Quantity:
- Stage of Operation:
- B. No.:
- Date of Commencement:
- Date of Completion:
Signature
Author: (GM Production) | Checked by: (QA Manager) | Authorised by: (Director Technical) |
Date: | Date: | Date: |
(Review date on or before 12 months from date of authorization)