PURPOSE:
To lay down the procedure and methods for collecting the waste from all sections of
production departments to maintain hygienic environment of plant and responsibility for
implementation of this procedure.
SCOPE:
This procedure applies for whole production department.
RESPONSIBILITY :
The House Keeper.
The Production Supervisor.
The Production Manager.
PROCEDURE
- Clean any spillages on shop-floor immediately.
 - Empty the waste bin of packing department at an interval of every one hour.
 - Collect waste from all the sections in janitor room.
 - Sort out the waste from packing section in presence of an authorised person.
 - Dispose the waste into the scrap yard.
 - Destroy all scrap printed packaging material by incineration in presence of quality assurance and security personnel. Record the destruction.
 - Lift the scrap from scrap yard every Saturday evening.
 
| Author: (GM Production) | Checked by: (QC Manager) | Authorised by: (Director Technical) | 
| Date: | Date : | Date : | 
(Review date on or before 12 months from date of authorization)