PURPOSE: To lay down a procedure for the maintenance in case of batch coding machine .
RESPONSIBILITY :
1. Section Supervisor/Shift In-charge
2. Maintenance Engineer
PROCEDURE:
- Clean the machine with I.P.A & dry cloth.
 - Put ink on the roller and moue – the machine for 2-3 minutes to spread ink on the roller.
 - By using clothes sided tape, fix the stereo on the roller.
 - Start the machine
 - Adjust the place of stereo according to required place of units.
 - The printed unit must be checked from technical staff.
 - After getting ok report start printing units.
 
| Author: (Production Manager) | Checked by: (QA Manager) | Authorized by: (Director Administration) | 
| Date: | Date : | Date : | 
(Review date on or before 12 months from date of authorization)