PURPOSE: To ensure the quality of final pack as per prescribed standard.
SCOPE: This procedure applies during inprocess of packing of products.
RESPONSIBILITY :
1.Production Chemist
2.Q.A. Chemist
PROCEDURE:
In Process Checks on the Packing Line is to be carried out in following manner:
A.STRIPS
- Count the number of strips in the carton.
- Check the appearance of the strips.
3. Check the Batch No., Mfg. Date, Exp. Date & Retail Price and matter on the strips as per Batch Production Record (BPR).
4. Over printed matter on the aluminum foil is clean and legible.
B.CARTONS
- Check the Code No. on the cartons as per reference carton.
- Over printed matter is clear and correct.
- Check the Batch No., Mfg. Date, Exp. Date & Retail Price on the carton as per Batch Production Record (BPR).
- Check the content of the carton such as Leaflet, applicator, etc. if any.
- After checking of cartons and strips, the supervisor must endorse the carton along with date on which checked.
.CORRUGATED BOX
- Check that corrugated box is of the desired ply and the over printed matter, if any.
- The no. of cartons in each corrugated box is to be checked.
- The worker who keeping the carton in box must initial on each corrugated box
and writes the quantity